Date: Sep 2017 - Current

 

Project: 5 Star 156key hotel located at La Mer development, Dubai. 

 

Position: Senior Architect / Project Manager.

 

Responsibility:

  1. Project and Office Management: • Meeting with clients • Discussions with clients of the brief and the preliminary drawings • Formulation of client requirements • Pre-contract project management • Determination of contract conditions • Drafting of correspondence • Co-ordination of the work of consultants • Co-ordination with internal team of architects

  2. Design and Design Documentation: Meeting with relevant authorities • Assessment of the implications of relevant regulations • Preparation of schematic and design development drawings • Checking design proposals against statutory requirements • Preparation of budgets, estimates, cost plans and feasibility studies

  3. Construction Documents: • Preparation of working drawings and specifications • Monitoring the documentation process against time and cost plans • Checking of documents for compliance with statutory requirements • Co-ordination of subcontractors documentation • Co-ordination of contract drawings and specifications

  4. Contract Administration: • Preparing, receiving and adjudication of documentation of bids or tenders and the procedures connected therewith • Site meetings • Inspection of works • Issuing instructions, notices, and certificates to the contractor • Client reports • Administration of variations and monetary allowances 

 

The scope of work:

Stage 1: appraisal and definition of the project,

Stage 2: design concept,

Stage 3: design development,

Stage 4: technical documentation and municipality approval,

Stage 5: contract administration and inspection.
The project has had a number of changes after the tender phase which has lead to various design options and resubmittals to local authorities. 

 

Status: Under construction

 

 

Programs used: Revit, AutoCAD, Excell