Wingate Apartments

Date: 2012 - 2015
Project: 52 key, 4-star hotel and apartment extension in Sea Point, Cape Town.
Position: Project Architect.
Responsibility:
-
Project and Office Management: • Meeting with clients • Discussions with clients of the brief and the preliminary drawings • Formulation of client requirements • Drafting of correspondence • Co-ordination of the work of consultants • Office and project accounting systems • Statutory requirements for running an office • Professional Insurance
-
Design and Design Documentation: • Site investigation and evaluation • Meeting with relevant authorities • Assessment of the implications of relevant regulations • Preparation of schematic and design development drawings • Checking design proposals against statutory requirements • Preparation of budgets, estimates, cost plans and feasibility studies
-
Construction Documents: • Preparation of working drawings and specifications • Monitoring the documentation process against time and cost plans • Checking of documents for compliance with statutory requirements • Co-ordination of subcontractors documentation • Co-ordination of contract drawings and specifications
-
Contract Administration: • Preparing documentation for tenders and the procedures connected therewith • Site meetings • Inspection of works • Issuing instructions, notices, and certificates to the contractor • Client reports • Administration of variations and monetary allowances • As-built drawings • Final accounts
The scope of work:
Stage 1: appraisal and definition of the project,
Stage 2: design concept,
Stage 3: design development,
Stage 4: technical documentation and municipality approval,
Stage 5: contract administration and inspection
Status: Complete
Programs used: AutoCAD, Revit, Photoshop
![]() Wingate front facade as built | ![]() Wingate front facade as built | ![]() Wingate front facade as buil |
---|---|---|
![]() Facade development context perspectives | ![]() Lobby interior design development perspectives | ![]() Bedroom interior design development perspectives |
![]() Facade development perspectives | ![]() Facade development | ![]() Typical floor plan |
![]() 6th floor plan | ![]() Typical section | ![]() Tapered channel detail |
![]() Frameless window detailing | ![]() Roof detail | ![]() Front facade sprocket detail |
![]() Frameless window detailing | ![]() Staircase detail drawings | ![]() Staircase section |
![]() Staircase detail | ![]() Airconditioning detail |