Wingate Apartments

Date: 2012 - 2015

 

Project: 52 key, 4-star hotel and apartment extension in Sea Point, Cape Town.

 

Position: Project Architect.

 

Responsibility:

  1. Project and Office Management: • Meeting with clients • Discussions with clients of the brief and the preliminary drawings • Formulation of client requirements • Drafting of correspondence • Co-ordination of the work of consultants • Office and project accounting systems • Statutory requirements for running an office • Professional Insurance 

  2. Design and Design Documentation: • Site investigation and evaluation • Meeting with relevant authorities • Assessment of the implications of relevant regulations • Preparation of schematic and design development drawings • Checking design proposals against statutory requirements • Preparation of budgets, estimates, cost plans and feasibility studies

  3. Construction Documents: • Preparation of working drawings and specifications • Monitoring the documentation process against time and cost plans • Checking of documents for compliance with statutory requirements • Co-ordination of subcontractors documentation • Co-ordination of contract drawings and specifications

  4. Contract Administration: • Preparing documentation for tenders and the procedures connected therewith • Site meetings • Inspection of works • Issuing instructions, notices, and certificates to the contractor • Client reports • Administration of variations and monetary allowances • As-built drawings • Final accounts

 

The scope of work:

Stage 1: appraisal and definition of the project,

Stage 2: design concept,

Stage 3: design development,

Stage 4: technical documentation and municipality approval,

Stage 5: contract administration and inspection

 

Status: Complete

 

Programs used: AutoCAD, Revit, Photoshop

Wingate front facade as built

Wingate front facade as built

Wingate front facade as built

Wingate front facade as built

Wingate front facade as buil

Wingate front facade as buil

Facade development context perspectives

Facade development context perspectives

Lobby interior design development perspectives

Lobby interior design development perspectives

Bedroom interior design development perspectives

Bedroom interior design development perspectives

Facade development perspectives

Facade development perspectives

Facade development

Facade development

Typical floor plan

Typical floor plan

6th floor plan

6th floor plan

Typical section

Typical section

Tapered channel detail

Tapered channel detail

Frameless window detailing

Frameless window detailing

Roof detail

Roof detail

Front facade sprocket detail

Front facade sprocket detail

Frameless window detailing

Frameless window detailing

Staircase detail drawings

Staircase detail drawings

Staircase section

Staircase section

Staircase detail

Staircase detail

Airconditioning detail

Airconditioning detail

SEBASTIAN CLAYPOLE

bottom of page